SM Electric has the capability to successfully complete Utility Construction Projects safely and on schedule.

Our experience with working in and around utility apparatus is evident in our Safety Statistics. SM Electric is continually meeting and improving upon our goal of completing Utility Projects efficiently while encompassing Safe Work Practices and being recognized as the leader in the field of Utility Construction.

Because SM Electric projects are often under strict timelines that are of a critical nature, we place a heavy emphasis on the Safety of our employees. Our work practices have been developed through years of industry experience and give us the edge over our competitors, enabling us to maximize our efficiency on the job while NEVER compromising on Safety.

SM Electric employees adhere strictly to the Safe Work Practices laid out in our Safety Manual. Each of our employees are trained by our Safety Department before going to the field to commence work. Our dedication to the Safety and well-being of our employees is what helps us attract and keep the best people available.

Safety and health in our company is a part of every operation and is every employee’s responsibility, at all levels. Attaining an Accident Free work environment is the MOST important objective in our work culture.

  • Substation Construction up to 500kV
  • Circuit Breaker, disconnects, CCVT,s
  • Buswork, welded, mechanical and strain
  • Control Wiring & Terminations Relay rack installation and Modification
  • Control House installation and modification
  • Transformer retrofit / New Installations
  • Substation grounding
  • Conduit Duct banks
  • Erection of Steel Structures – lattice, tubular and l-beam steel
  • Substation maintenance services
  • Material and equipment procurement
  • Project and construction management

BRANCHBURG 500KV TRANSFORMER

Following the major failure of a 500KV transformer, SM Electric was tasked to install a new SMIT 500KV Transformer at the ...

COX'S CORNER 230KV SHUNT REACTOR

The dry-type Reactor was the first installation of its kind for PSEG. Along with the reactor, SM Electric built a new bus section and breaker to...

HOBOKEN 230KV UPGRADE

A part of the PSEG Energy Strong and Transmission Hardening projects, SM Electric is contracted on three separate projects on one site. The first segment includes removal...

MARION SWITCHING STATION 26KV

SM Electric was recently contracted by PSEG and Burns and McDonnell as the Prime Contractor to build an all new 26KV ...

NEW MILFORD SUBSTATION

SM Electric performed the installation of a new line position for the 230KV Oil Static Line at New Milford Substation. Work included the installation of three (3) 230kV Disconnect...

SEWAREN SHELTERED AISLE SWITCHGEAR

The scope included installing an elevated steel structure to raise the energized switchgear above possible flood levels. This SOW provided...

UTILITY

WIRELESS

INDUSTRIAL

SM Electric Group, Inc.
601 New Brunswick Avenue
Rahway, NJ 07065

Phone: 732 388 3550
Email: info@smelectric.com

 

 

 

 

  • Home
  • Contact
  • Privacy Policy
© Copyright 2025 - SM Electric Group, Inc.
Scroll to top