Owner: Public Service Electric and Gas
Location: Sewaren, NJ
The scope included installing an elevated steel structure to raise the energized switchgear above possible flood levels. This SOW provided for the demolition of 26kV yard, installation of 26kV Sheltered Aisle Switchgear, raising the 26kV current limiting reactors, circuit switchers and their motor operators associated with the Capacitor Banks, removal of electrical equipment and relay racks in the 26kV Control Room, cable pulling and termination and all other associated electrical work. All project controls were completed, including executing a fiber optic cable pull to the Sewaren Generation Station.