Owner: Public Service Electric and Gas
Location: Hoboken, NJ
Highlight: Replacement of existing transformers with new ones, along with installation of bus systems and cable riser structures.
A part of the PSEG Energy Strong and Transmission Hardening projects, SM Electric is contracted on three separate projects on one site. The first segment includes removal of internal equipment’s for Transformer T2 and T4 control cabinets, installation of new pre-wired control cabinets for T2 & T4, and all other associated electrical work relative to transformer. The second segment is the installation of the 13KV bus system, steel supports, and pothead structures, as well as demolition of the existing Feeder rows. The last segment is the replacement of the 230KV bus system and installation of a XLPE cable riser structure.