Owner: Verizon
SM Electric was tasked with the installation of a full cell site platform with large hydraulic crane in between two phases of a 500 KV circuit. This work required a single day outage that allowed the crew time to test and ground the circuit, install pole with all support bracing and complete the cellular platform. Work was completed with no incident.